Power Upgradation

Power upgrade for existing facility in compliance with DEWA regulations.

As a DEWA approved contractor we are well placed to help our clients to upgrade their existing connected load/power from DEWA. Be it additional load required for new machineries, Air conditioning load (chillers), a new office block or even an extension of an existing factory, we are always providing our customers with cost effective solutions to achieve their business ambitions or expansion plans. Our team will first study the proposed additional load requirementand then based on existing as-built documentations and site visits provide our proposal. We inform the client the step-by-step processes involved and a tentative time frame required for their power upgrade. We are able to provide a complete solution for the DEWA power upgrade in terms of design/drafting works, liaison with DEWA departments and site work execution including switchgear modification and installation works.

Once the client specific requirement is clear our team will coordinate with DEWA authorities with every step of the additional load approval process such as NOC application, Shop drawing preparation based on NOC status, Follow Up update on substation and LV drawing approval; Follow Up update on estimation and HV inspection , LV Inspection and meter connection.

If you are looking to expand your operations and are in need of additional load and power for your existing warehouse/facility please Contact Us.